期刊文献+

胡家河副井井架设计分析

Design and Analysis of Auxiliary Shaft Headframe in Hujiahe Coal Mine
下载PDF
导出
摘要 钢井架是矿井地面生产系统的重要构筑物。介绍了胡家河煤矿副井井架的设计过程,运用有限元分析的方法进行结构计算,并对设计中存在的问题提出切实可行的解决方法,判别了设计的有效性和合理性,对今后的井架设计具有一定的参考价值。 Steel headframe is of the important structures of mine production surface.This paper briefly introduces the design process of auxiliary shaft headframe of HuJiaHe coal mine lies in Shanxi province,by using the finite element analysis method for structural calculation,put forward the feasible solution of design for the problems existing in the design,and differentiate the validity and rationality of the design of headframe.The design has certain reference value in future.
出处 《工程建设与设计》 2011年第7期66-69,共4页 Construction & Design for Engineering
关键词 钢井架 MIDASGEN 稳定 计算长度 steel headframe midas gen stability effective length
  • 相关文献

参考文献4

  • 1GB50385-2006,矿山井架设计规范[S].
  • 2中煤西安设计工程有限责任公司.陕西省彬长矿区胡家河矿井及选煤厂初步设计说明书[R],2007.
  • 3北京迈达斯技术有限公司.MIDAS/Gcn分析手册[K],2005.
  • 4GB50017-2003.钢结构设计规范[S].[S].,..

共引文献2080

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部