摘要
要强化企业风险意识,要有预见性,同时还要明确索赔的时效性。为了保证工程建设顺利进行,特别要做工程变更和施工索赔的管理工作。
It is required to strengthen sense of business risks,have the foreseeability and pinpoint the timeliness of claims.In order to guarantee the smooth engineering construction,the management of engineering changes and construction claims are especially necessary.
出处
《包钢科技》
2011年第3期82-83,共2页
Science & Technology of Baotou Steel
关键词
合同
管理
索赔
利益
contracts
management
claims
benefits