期刊文献+

项目设计阶段投资控制系统模型设计与实现 被引量:2

Design And Realization for Investment Control System Model in Design Phase for A Project
下载PDF
导出
摘要 目前设计阶段主要侧重于运用价值工程、优化设计等技术方法来控制投资,缺乏控制投资的机制而造成的设计合理性与经济性脱节,使投资控制只能在一定范围内产生作用。通过将控制系统理论引入设计阶段的投资控制,运用控制系统的理论和方法管理设计阶段投资控制过程,以分析控制系统的基本构成要素为基础,构建项目设计阶段的投资控制系统,并分析设计阶段投资控制系统的实现机制,从系统的角度对建设项目设计阶段投资进行有效的调节和控制。 Currently people generally use technical methods such as value engineering and optimum design to control the investment of a project. But lacking of control mechanisms for investment caused the disconnection between the rationality and economic for the engineering design. In that case, investment control can only be effective within a certain range. Though introducing the control system theory, the article will build a investment con- trol system in design phase for a project on the basis of analyzing the elements of the system, which would manage the process of investment control by the theory and methods of control system. What's more, it analyzed implementation mechanism of the system. In this case, reach the goal of regulating and controlling the investment in design phase from the perspective of system.
作者 柯洪 王川
出处 《哈尔滨商业大学学报(社会科学版)》 2011年第4期18-22,共5页 Journal of Harbin University of Commerce:Social Science Edition
关键词 投资控制 设计阶段 控制系统 系统模型 investment control design phase control system system model
  • 相关文献

参考文献5

二级参考文献14

  • 1孙永健,郭忠文,刘士安.关于工程建设项目投资控制的几个问题探讨[J].济南职业学院学报,2006(2):58-59. 被引量:10
  • 2李晓枫,姬作收,郭继红.探析建设项目投资控制手段的运用[J].安徽建筑,2006,13(3):142-142. 被引量:1
  • 3蔡中辉.建设工程项目信息管理[M].北京:中国计划出版社,2007
  • 4Cagle R F.Implementing an owner's cost control system[A].AACE Transactions[C].Morgantown:AACE International,1991.67-70.
  • 5Barrie S D,Paulson C B.Professional construction management[M].3rd ed.Singapore:McGraw-Hill Inc,1992.
  • 6McMullan E L.Cost control-the tricks and traps[A].AACE Transactions[C].Morgantown:AACE International,1991.102-106.
  • 7Hauser A M.WBS development for an $11 billion transportation project[A].AACE Transactions[C].Morgantown:AACE International,1994.85-89.
  • 8Proffenberger J D.Cost management:Trades vs systems estimating[A].AACE Transactions[C].Morgantown:AACE International,1991.35-38.
  • 9Abran L H.Is coding your nightmare? See how we solve it[A].AACE Transactions[C].Morgantown:AACE International,1981.71-73.
  • 10Sommer R H.Kostensteuerung von hochbauten[M].Berlin:Bauverlag GmbH,1983.

共引文献21

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部