摘要
根据抚州铀矿铀矿冶公司的生产现状,对铀矿冶生产成本即矿山采掘成本和选冶加工成本逐项进行了定量分析。
The production costs in uranium ming and metallurgy have been analyzed quantitatively term by term according to present production situation for The Uraniu m Mining and Metallurgy Corp.which is part of Fuzhou Uranium Mine.The principal factors influencing on the production costs and the main means reducing the production costs have been found.
出处
《铀矿冶》
CAS
1999年第3期208-212,共5页
Uranium Mining and Metallurgy
关键词
铀矿
采矿
选矿
铀矿冶
生产成本
Uranium Ming Mineral dressing Hydrometallurgy cost