非同期并列对发电机绝缘造成的损坏及处理 被引量:1

Damage to the Generator Insulation Caused by Random Paralleling and Its Solution
下载PDF
导出
摘要 某热电厂的3#发电机发生了非同期合闸,短路电流为6000A,定子绕组端部多根线棒位移达到10mm左右,固定绑扎绳多根断裂。进行常规的试验没有发现绝缘缺陷,当进行交流耐压试验时,定子绕组绝缘发生击穿。本文对发电机故障后的绝缘试验情况及绝缘击穿部位的查找进行了重点介绍。 The #3 generator of a thermal power plant switched in unparallel.The short-circuits current was 6000A,the displacement of several winding bars at the bottom of the stator winding reached about 10mm,and several attached banding cords cracked.The insulation defect was not detected in the conventional test.When the alternating current breakdown test was carried out,the stator winding insulation broke down.In this paper,the insulation test after breakage and searching the location of the breakdown insulation are detailed.
机构地区 泰安供电公司
出处 《大电机技术》 北大核心 2011年第4期45-47,共3页 Large Electric Machine and Hydraulic Turbine
关键词 发电机 非同期并列 绝缘损坏 处理 generator random paralleling insulation damage solution
  • 相关文献

参考文献1

  • 1GB50150-2006,电气装置安装工程电气设备交接试验标准[S]

共引文献116

同被引文献16

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部