摘要
在完井工作过程中,油藏开发人员与完井采油设计人员要紧密结合,互相交流。国内外6个不同类型油田的完井实例,说明合理的完井管柱对油田开发和生产的作用十分重要。
Inuring well completion operations, the reservoir and well completion engineers need to work as a team and should maintain close communications. 6 well completion cases of different foreign oil field types are discussed in this paper, pointing out the importance of reasonable completion strings to the field development and production.
关键词
完井设计
井下措施
采收率
油田开采
well completion design, typical examples, down- hole operations, enhanced recovery