期刊文献+

沙角C厂2号汽轮发电机组的快关试验 被引量:2

FAST VALVING TEST OF STEAM TURBINE GENERATOR SET No.2 IN SHAJIAO 'C' POWER PLANT
下载PDF
导出
摘要 汽轮发电机组采用快关汽门,是提高电力系统稳定性的一项有效措施。对于经长距离超高压输电线路连接到受端系统的远方电源,适于采用“持续快关”。沙角C厂共有3 台未配置旁路系统的660MW 机组。1996 年11 月29 日,在其中1台机组上成功地进行了“短暂快关”与“持续快关”试验。 To improve power system stability the fast valving of steam turbine generator set is an effective approach. For remote power source which is connected to receiving power system it is suitable to apply the sustained fast valving. In Shajiao 'C' power plant there are three 660MW turbo-generator sets in which the by-pass system for steam turbine has not been equipped. On November 29, 1996 the temporary and sustained fast valving had been successfully tested on one of the 660MW sets. In this paper the test result is presented and some discussions about the effectiveness of improving power system stability by use of fast valving are given.
作者 蒙定中
出处 《电网技术》 EI CSCD 北大核心 1999年第12期11-15,23,共6页 Power System Technology
关键词 汽轮发电机组 快关汽门 试验 电力系统稳定性 power system stability steam turbine generator sets fast valving
  • 相关文献

参考文献1

  • 1王梅义,大电网系统技术(第2版),1995年

同被引文献18

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部