结合某双塔钢桁梁斜拉桥的地理和地质情况及塔身构造,系统地介绍了主桥主塔的液压爬模系统、塔柱施工工艺,总结了采用液压爬模施工取得的良好效益,以便推广液压爬模工艺的应用。
Combining with geographical and geological conditions and tower structure of a twin towers firm inclined beam cable-stayed bridge,the paper systematically introduced the hydraulic climb module system of main bridge tower,tower pillar construction technology,summarized that adopting hydraulic climb module construction achieved good efficiency,so as to promote the application of hydraulic climb module technique.
出处
《山西建筑》
2011年第23期177-180,共4页
Shanxi Architecture
关键词
斜拉桥
主塔
液压爬模
支架
施工
cable-stayed bridge
main tower
hydraulic climb module
scaffold
construction