摘要
在深入调研、分析、计算的基础上,总结了影响核电发电机、汽轮机容量和转速选择的众多因素,并建立了1 000 MW 级容量和转速选择的模糊综合评判模型,可供国产化决策参考.该方法适用于重大工程的决策.
The necessity of vigorously developing the nuclear generating unit in our country was outlined, on the basis of thoroughly study, analysis and calculation, lots of factors, which affect the capacity of nuclear generator, turbine and rotor speed selection were summarized. Furthermore, a fuzzy comprehensive evaluation model of capacity and rotor speed selection of 1 000 MW nuclear generating unit was created, scientific conclusion was made, which can be referred in the decision in our country. Such a method is suitable for the decision of important projectors. 000 MW nuclear generating unit was created, scientific conclusion was made, which can be referred in the decision in our country. Such a method is suitable for the decision of important projectors.
出处
《上海交通大学学报》
EI
CAS
CSCD
北大核心
1999年第12期1471-1475,共5页
Journal of Shanghai Jiaotong University
关键词
核电机组
汽轮机
模糊决策
综合评判
容量
转速
nuclear generating unit
generator
turbine
fuzzy decision
comprehensive evaluation