利用正装迭代法确定斜拉桥合理施工状态 被引量:5

Cable-stayed Bridge Construction Condition Optimization Applying Forward-analysis Iterative Method
下载PDF
导出
摘要 以某三跨预应力混凝土斜拉桥为工程背景,分析了利用正装迭代法确定合理施工状态过程中的关键问题。包括:确定合理成桥状态所需的控制参数、施工中几何非线性影响、支架脱空的模拟、索力影响矩阵及收敛性问题的讨论。计算结果表明,合理地考虑上述因素之后确定的合理施工状态,可以使最终的成桥状态与优化的合理成桥状态非常接近。证明此方法在斜拉桥工程计算中很大的实用价值。 Based on a PC cable-stayed bridge, the key points of forward-analysis iterative method is discussed, applying to determine the proper construction condition. Such as the control parameters to make proper construction condition, the geometric non-linear influence, the separate of supports during construction process, cable force influence matrix and the convergence discussion. After taking the above factors into consideration, the finished state approached the reasonable one. The method has great practical values in cable-stayed bridge engineering are proved.
出处 《科学技术与工程》 2011年第22期5470-5473,共4页 Science Technology and Engineering
关键词 正装迭代法 几何非线性 索力影响矩阵 合理施工状态 forward-analysis iterative method reasonable construction condition geometric non-linear cable force influence matrix
  • 相关文献

参考文献4

二级参考文献12

  • 1杜国华,姜林.斜拉桥的合理索力及其施工张拉力[J].桥梁建设,1989,19(3):11-17. 被引量:84
  • 2伏魁先,刘学信,黄华彪.斜拉桥面内整体失稳分析[J].铁道学报,1993,15(4):74-79. 被引量:12
  • 3肖汝诚,1996年
  • 4郭文复,1994年斜拉桥国际学术讨论会论文集,1995年,532页
  • 5陆楸,中国公路学报,1990年,1期,1页
  • 6杜国华,桥梁建设,1989年,3期,18页
  • 7TANG M C. Design of cable - stayed bridges [J]. Journal of the Structural Division, Proceedings of the American Society of civil Engineers. 1972:1789 - 1802.
  • 8WANG P H, TSENG T C, YANG C G. Initial shape of cable - stayed bridges [J]. Computers & Structures,1993,46:1095 - 1106.
  • 9ADELI H, ZHANG J, Fully nonlinear analysis of composite girder cable - stayed bridges [J]. Computers &Structures,1995,54:267-277.
  • 10肖汝诚,项海帆.斜拉桥索力优化的影响矩阵法[J].同济大学学报(自然科学版),1998,26(3):235-240. 被引量:196

共引文献283

同被引文献31

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部