摘要
通过叙述现场试验确定地基处理施工方案的过程,说明施工监理处理设计变更及进行质量控制的方法。
The change of design dalt by the construction supervision and the method for quality control were described in the paper by narrating the process of field test determining the costruction proposal for foundation treatment.
出处
《港工技术》
北大核心
1999年第4期31-33,共3页
Port Engineering Technology
关键词
地基处理
施工监理
质量控制
集装箱码头
foundation treatment, change of design, construction supervision, quality control