摘要
结合汕头国际集装箱码头道路堆场地基处理监测,介绍在堆载预压的过程中采用各种测试手段开展全方位、全过程的监测工作,检验堆载预压法改善和加固软土地基的效果和能力。
Through the monitoring for the foundation treatment of road and storage yard of the International Container Terminal of Shantou, the monitoring works in all directions and whole process perfected by each kind of means in order to inspect the effectiveness and capacity of improved and consolidated soft soil foundation by the preloading method were manialy introduced in the paper.
出处
《港工技术》
北大核心
1999年第4期43-48,共6页
Port Engineering Technology
关键词
道路堆场
加固
监测
集装箱码头
软土地基
Shantou, road and storage yard, soft soil consolidation, foundation treatment, monitoring