摘要
详细介绍了S233省道上盐邵河大桥现浇箱梁后张法预应力张拉的一些主要过程,并且对张拉过程中遇到的实际问题作了简单的分析。
This paper introduced major process of YanShaoHe bridge construction in S233 provincial road after cast-in-situ concrete box girder by a method of post-tensioned prestressing,and it made a simple analysis on the practical problems in the process of the tensioning.
出处
《中国西部科技》
2011年第22期44-46,共3页
Science and Technology of West China
关键词
后张法预应力
张拉
箱梁
Post-tensioned prestressing
Tensioning
Box girder