期刊文献+

舟曲三眼峪泥石流监测预警方案设计 被引量:6

The Design for Zhouqu Sanyanyu Debris Flow Monitoring and Early Warning System
下载PDF
导出
摘要 对泥石流的防治不仅要有工程治理措施,而且应配合相应的监测预警措施,以达到有效减缓地质灾害风险的目的。笔者以舟曲三眼峪泥石流为例,设计了针对泥石流触发因素的降雨监测方案;针对泥石流发生和变化过程的次声、泥位、红外线遮断、视频监测方案;针对泥石流物源的滑坡崩塌监测方案;以及针对泥石流防治工程拦挡坝的应力应变监测方案;在此基础上形成了三眼峪泥石流沟的综合监测系统,并建立监测预警信息系统。 The mitigation for debris flow not only needs engineering measurements, but also needs monitoring and early warning system, to obtain the goal of risk-reducing effectively. This paper took Zhouqu Sanyanyu debris flow as a studying case, proposed a comprehensive monitoring and early warning system, designed the rainfall monitoring sub-system for the debris flow triggering factors; the infrasound, mud level, ultra red-ray interruption, and video monitoring sub-system for the debris flow occurring and moving; the landslide monitoring sub-system for the debris flow resources; and the dam strain and stress monitoring sub-system for the debris flow engineering count measurements. Finally build up the early warning information system for the whole debris flow.
出处 《西北地质》 CAS CSCD 2011年第3期95-99,共5页 Northwestern Geology
基金 国土资源大调查计划项目"西北黄土高原区地质灾害详细调查"(1212010640330) 地调项目"延安宝塔区地质灾害监测预警示范"(编号1212010740907) 地调项目"西北黄土高原区地质灾害综合研究"(编号1212010914039)
关键词 舟曲“8.8”特大泥石流 三眼峪 监测预警 Zhouqu "8. 8" extremely large debris flow Sanyanyu monitoring and early warning
  • 相关文献

参考文献2

二级参考文献19

共引文献19

同被引文献67

引证文献6

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部