摘要
本文主要总结西林钢铁集团有限公司炼钢总厂转炉工序双炉座与双连铸机在生产实践中出现的一些问题以及采取的改进措施,并提出了今后努力的方向。
his paper introduces some problems that appeared in the productive practice in converter steel -making plant of Xilin Iron & Steel Group Co. Ltd. Some effective measures had been taken. This paper introduces the direction of working in the future.
关键词
双转炉
双连铸机
配合
two converters
two concast machines
match up