期刊文献+

Application of high temperature heat pipe in hypersonic vehicles thermal protection 被引量:9

Application of high temperature heat pipe in hypersonic vehicles thermal protection
下载PDF
导出
摘要 In order to develop further the application of high temperature heat pipe in hypersonic vehicles thermal protection,the principles and characteristics of high temperature heat pipe used in hypersonic vehicles thermal protection were introduced.The methods of numerical simulation,theory analysis and experiment research were utilized to analyze the frozen start-up and steady state characteristic of the heat pipe as well as the machining improvement for fabricating irregularly shaped heat pipe which is suitable for leading edge of hypersonic vehicles.The results indicate that the frozen start-up time of heat pipe is long(10 min) and there exists large temperature difference along the heat pipe(47 °C/cm),but the heat pipe can reduce the temperature in stagnation area of hypersonic vehicles from 1 926 to 982 °C and work normally during 1 000-1 200°C.How to improve the maximum heat transfer capability and reduce the time needed for start-up from frozen state of the heat pipe by optimizing thermostructure such as designing of a novel wick with high performance is the key point in hypersonic vehicles thermal protection of heat pipe. In order to develop further the application of high temperature heat pipe in hypersonic vehicles thermal protection, the principles and characteristics of high temperature heat pipe used in hypersonic vehicles thermal protection were introduced. The methods of numerical simulation, theory analysis and experiment research were utilized to analyze the frozen start-up and steady state characteristic of the heat pipe as well as the machining improvement for fabricating irregularly shaped heat pipe which is suitable for leading edge of hypersonic vehicles. The results indicate that the frozen start-up time of heat pipe is long (10 min) and there exists large temperature difference along the heat pipe (47 ℃/cm), but the heat pipe can reduce the temperature in stagnation area of hypersonic vehicles from 1 926 to 982 ℃ and work normally during 1 000-1 200℃. How to improve the maximum heat transfer capability and reduce the time needed for start-up from frozen state of the heat pipe by optimizing thermostructure such as designing of a novel wick with high performance is the key point in hypersonic vehicles thermal protection of heat pipe.
机构地区 College of Energy
出处 《Journal of Central South University》 SCIE EI CAS 2011年第4期1278-1284,共7页 中南大学学报(英文版)
基金 Project(51076062) supported by the National Natural Science Foundation of China
关键词 高超声速飞行器 高温热管 热保护器 应用 状态特征 启动时间 不规则形状 数值模拟 thermal protection high temperature heat pipe heat transfer limit start-up time
  • 相关文献

参考文献3

二级参考文献31

  • 1张伟,王乐善,王梦魁,王庆盛,巨亚堂.气动加热模拟试验加热系统控制研究[J].强度与环境,2005,32(3):45-52. 被引量:9
  • 2洪长青,张幸红,韩杰才,张贺新.热防护用发汗冷却技术的研究进展(Ⅰ)──冷却方式分类、发汗冷却材料及其基本理论模型[J].宇航材料工艺,2005,35(6):7-12. 被引量:8
  • 3SILVERSTEIN C C. A feasibility study of heat pipe-cooled leading edges for hypersonic cruise aircraft[R]. NASA CR 1857, 1971.
  • 4NIBLOCK G A, REEDER J C. Four space shuttle wing leading edge concepts[J]. Journal of Spacecraft and Rockets, 1974,11(5):314-320.
  • 5ANON. Study of structural active cooling and heat sink systems for space shuttle[R]. NASA CR 123912, 1972.
  • 6CAMARDA C J. Analysis and radiant heating tests of a heat-pipe-cooled leading edge [R]. NASA TN D-8468, 1977.
  • 7GLASS D E. Heat-pipe-cooled leading edges for hypersonic vehicles[R]. NASA Langley Research Center July 12-13, 2006.
  • 8American Society for Testing and Materials. C177-04 Standard test method for steady-state heat flux measurements and thermal transmission properties by means of the guarded-hot-plate apparatus [S]//2004 Annual Book of ASTM Standards. USA:American Society of Testing Materials, 2004.
  • 9American Society for Testing and Materials. C411-05 Standard test method for hot-surface performance of high-temperature thermal insulation [S]//2004 Annual Book of ASTM Standards. USA: American Society of Testing Materials, 2004.
  • 10Richards W L. Strain gage measurement errors in the transient heating of structural components[R]. NASA Technical Memorandum 104274, December 1993.