摘要
洛钼集团为满足日益扩大的钼精矿出口需要,不断增加选矿二公司51%高品位钼精矿计划。对5 000 t/d选矿车间精选工艺进行较大规模改造,采用CCF浮选柱作为精选后续作业,改造后运行实践表明,精矿品位得到了大幅度提高,达到了设计要求,取得了较为满意的效果。钼精矿质量完全符合国家和企业标准。
To meet the ever-growing export needs for molybdenum concertrates,China Molybdenum Co.Ltd.assigns a mission of high grade(51%)production to the second mineral processing company.The large-scale transformation has been adopted to cleaning process in dressing workshop of 5 000 t/d.The CCF floatation column is adopted as subsequent assignments of cleaning.The result shows that: the grade of concentrates got increased greatly,met the design requirements and achieved satisfactory results.The quality of molybdenum concentrates completely accords with country and the enterprise standard.
出处
《中国钼业》
2011年第3期22-25,共4页
China Molybdenum Industry
关键词
钼精选
CCF浮选柱
钼精矿
品位
molybdenum cleaning
CCF floatation column
molybdenum concentrates
grade