期刊文献+

考虑岩石峰后特性的矿井深埋巷道支护方法研究 被引量:3

Study on Mine Roadway Support Method in Deep Mine in Consideration of Rock Features After Peak Value
下载PDF
导出
摘要 随着采矿工程逐渐向深部发展,关于矿井深埋巷道支护的研究已成为地下工程中的热点课题之一。传统的支护方法往往立足于对岩体进行峰前加固,提高岩体整体性和承载能力,避免巷道破坏。这在开采深度不大且围岩强度较高时是可行的,但在深部开采尤其是软岩巷道中往往是难以实现的,所以考虑岩石峰后强度及变形规律的支护手段更加符合工程实际。文章通过分析围压水平对岩石残余强度的影响规律,论证了巷道峰后支护的可行性,同时基于蠕变和长期强度,得到了深埋巷道的合理支护方式及支护时间。 With the mining projects gradually developed to the deep depth,the study on the mine roadway support in deep mine is becoming one of the hot programs in the underground projects.The conventional support method was usually to support the rock mass before the peak value occurred in order to improve the rock mass integration and the bearing capacity and to avoid the mine roadway failure.The conventional support method could be feasible when the mining depth was not deep and the surrounding rock strength was not high.But in the deep mining depth,the conventional support method would be difficult applied to the mine soft rock roadway.Thus the support means with consideration of the after rock peak strength and deformation law could meet the project reality.With the analysis on the surrounding rock pressure level affected to the residual strength of the rock,the feasibility of the support after the peak value occurred was verified and the rational support method and the support time of the deep mine roadway were obtained.
出处 《煤炭工程》 北大核心 2011年第8期39-41,44,共4页 Coal Engineering
基金 国家重点基础研究发展计划(973)计划(2010CB226802) 国家自然基金资助项目(50574064 50879049)
关键词 深埋巷道 残余强度 围压 蠕变 二次支护 deep mine roadway residual strength surrounding pressure creep secondary support
  • 相关文献

参考文献6

二级参考文献33

共引文献206

同被引文献45

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部