期刊文献+

具有自动化活动配重系统的新型高铁下行式移动模架的总体设计研究

General Design of the New Type Movable Mould Frame with Automatic Movable Weights for High Speed Railways
下载PDF
导出
摘要 对原高铁下行式移动模架进行了创新和优化,取消了原来2榀主框架间的4道柔性横联;而将前门架、中门架及后门架都设计成马鞍式刚性横联,使2榀主框架在横向刚性地联接成为一个整体;同时,在开模系统中引入了自动化活动配重。这样,使新型高铁下行式移动模架的结构形式更加紧凑合理,使用性能更加高效快捷。该模架在施工过程中,效果理想,得到了用户的广泛好评。另外,还重点介绍了自动化活动配重系统的设计理论和方法。 Innovations and optimizations have been carried out for the original movable mould frame for high speed railways: four flexible lateral bracings were canceled, the forward frame, middle frame and rear frame were designed with saddle-type lateral bracings, so that two main rigid frames were connected transversely into a whole body; meanwhile, automatic movable weights were introduced into the mould opening system. As a result, the structure of the new type movable mould frame for high speed railways will be more compact and reasonable, the performance will be more efficient. The design theory and method for the automatic movable weight system are introduced in detail. The mould flame has been effectively adopted by many customers with good recognitions.
出处 《铁道标准设计》 北大核心 2011年第8期50-53,共4页 Railway Standard Design
关键词 下行式移动模架 活动配重 横向刚性横联 双卷筒 设计 Movable mould frame Movable weights Lateral rigid bracing Double drum crane Design
  • 相关文献

参考文献7

  • 1国家标准化委员会.GB3811-2008起重机设计规范[S]北京:中国标准出版社,2009.
  • 2GB/T3766-2001.液压系统通用技术条件[S].
  • 3郑文纬,吴克坚.机械原理[M].7版.北京:高等教育出版社,2000.
  • 4哈尔滨工业大学理论力学教研室.理论力学[M].4版.北京:高等教育出版社,1995.
  • 5张质文 王金诺.起重机设计手册[M].北京:中国铁道出版社,2001..
  • 6成大先.机械设计手册[M].4版.北京:化学工业出版社,2001:206.
  • 7鞍钢集团钢绳厂.GB8918-2006重要用途钢丝绳[S].北京:中华人民共和国国家质量监督检验检疫总局,2006.

共引文献193

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部