摘要 通过分析周边环境和地质状况,对下穿东江的隧道施工方法、隧道衬砌内轮廓、隧道埋深、管片及盾构机选型进行技术方案研究。其中隧道施工方法考虑了东江通航要求、地质状况、施工场地、工期等因素进行比选;隧道衬砌内轮廓拟定主要通过分析限界、空气动力学的要求、管线布置来确定,并对管片设计要素进行论述;隧道埋深则从隧道上方建筑物安全、下穿地层的地质参数、施工安全、隧道抗浮、防洪要求来分析确定;最后论述在施工过程中应采取保证施工安全的措施。 Based on the analysis of ambient environment and geologic conditions, technical scheme study was carried out for the river-crossing Dongjiang tunnel in terms of construction method, tunnel embedded depth, selection of shield type and segments. In the construction method, related factors such as navigation requirements of Dongjiang river, geological conditions, working site, time limit, etc. were compared for selection; internal periphery of tunnel lining was determined through analysing clearance, requirements of aerodynamics and installation of pipe lines, considering the segment design factors; tunnel embedded depth was analysed and determined according to the safety of the buildings above the tuunel, geological parameters of the traversed ground, construction safety, anti-floating and anti-flood requirements of the tunnel. Necessary measures for securing construction safety are discussed in the end of the paper.
作者 徐慧宇
出处 《铁道标准设计》 北大核心 2011年第8期85-89,共5页 Railway Standard Design
关键词 城际轨道交通 水下隧道 盾构 内轮廓 管片 Inter-city rail transit Subaqueous tunnel Shield Internal periphery Segment
  • 相关文献

参考文献7

二级参考文献14

共引文献74

同被引文献17

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部