北京奥运会场馆建设项目管理WBS之我见

My Views on WBS in Project Management of Beijing Olympic Venues Construction
下载PDF
导出
摘要 北京奥运场馆建设具有结构造型复杂、科技含量高、使用要求高、超大规模、超大投资额、资金来源复杂、涉及子项目种类繁多、各子项目之间关联密切、项目干系人众多、管理跨度大等特点。根据项目的特点及自身要求选择与其相适应的WBS管理手段,从规划设计到施工建设全过程中全面实践了"绿色奥运、科技奥运、人文奥运"三大理念,推动了奥运工程建设水平的提高。 There are many characteristics in Beijing Olympic venue construction,such as complex structural modeling,high technology,high demand of use,large scale,tremendous investment,complicated sources of funding,close relationship between sub-projects,complex project stakeholders,high management span and so on.According to the characteristics and demands of project to selected the adaptable WBS management tools,fully embody the three concepts "the Green Olympics,the High-tech Olympics and the People's Olympics" from planning and design to entire process of construction,promoted the improvement of the Olympic venue construction.
作者 孙兵 徐魏
出处 《物流工程与管理》 2011年第7期106-107,71,共3页 Logistics Engineering and Management
关键词 奥运场馆 项目管理 WBS olympic venues project management work breakdown structure
  • 相关文献

参考文献2

  • 1昊涛.北京奥运工程项目管理创新[M].北京:中国建筑工业出版社中国新技术新产品,2008,(06).
  • 2刘占华.2008年奥运会风险管理研究.科技信息,2007,.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部