南水北调中线工程山门河隧洞支护及进洞设计 被引量:1

Supporting the Anchor Structure Design of Shanmen River Tunnel of Middle Route of South to North Water Transfer Project
下载PDF
导出
摘要 山门河隧洞是南水北调中线工程中断面最大的无压引水隧洞,跨度大、覆盖层较薄、隧洞围岩条件较差。确定洞口支护方式时,经过结构计算,比较了喷锚支护、预应力锚固、地下连续墙等多种支护方案,最终确定采用钢筋混凝土地下连续墙方案。进洞设计借鉴了城市地铁施工中浅埋暗挖的方法,采用超前支护和开挖衬砌方案,临时衬砌结构采用格栅钢架喷厚30 cm的C25混凝土,先对洞顶进行预加固,再开挖洞身。 Shanmen River tunnel is the largest free flow tunnel in the tunnel section of Middle Route of South to North Water Transfer Project.It is a long-span,low covered,and poor conditions surrounding rock construction.After comparison of spray-anchor program,pre-stressed anchor program,underground diaphragm wall and other program,the underground diaphragm wall is used to finalize the hole support method.Learned from the metro construction in Shallow method,advance support excavation lining method is used.First,use temporary lining by steel grille sprayed 30 cm thick of C25 concrete to reinforce the roof,then dig the tunnel.
出处 《人民黄河》 CAS 北大核心 2011年第7期119-121,共3页 Yellow River
关键词 无压引水隧洞 支护 地下连续墙 格栅钢架 山门河隧洞 南水北调中线工程 free flow tunnel support underground diaphragm wall steel grille Shanmen River tunnel Middle Route of South to North Water Transfer Project
  • 相关文献

同被引文献13

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部