摘要
武汉市白鹤嘴水厂以汉江水为水源,规划控制总规模为100×104 m3/d,近期设计规模为50×104 m3/d(分二期建设),一期工程(25×104 m3/d)建成投产后,运行良好,出水水质达到了《生活饮用水卫生标准(》GB 5749—2006)。介绍了工程的设计特点,包括取水工程、净水工艺、电气及自控系统的设计等内容。
Taking Hanjiang River as water source, the total planned design capacity of Baihezui Waterworks is 100× 10^4 m^3/d, and the recent design capacity is 50 ×10^4 m^3/d (construction in two phases). After being put into operation, the first-phase project of 25 ×10^4 m^3/d operates well, and the finished water quality meets the requirement of the Standards for Drinking Water Quality ( GB 5749 - 2006). The design characteristics of the Baihezui Waterworks are introduced, including water intake works, water purification processes, electrical system and automatic control system.
出处
《中国给水排水》
CAS
CSCD
北大核心
2011年第16期67-69,共3页
China Water & Wastewater
关键词
白鹤嘴水厂
取水工程
净水工程
Baihezui Waterworks
water intake works
water purification process