摘要
根据西藏昌都电网现状及其发展规划,探讨了"十二五"末期昌都电网与其他电网联网的必要性和可行性,并对其通过玉树与西北电网联网和通过玉曲河梯级电站与四川电网联网两种可行的方案进行了初步比较,最后初步推荐昌都电网通过玉曲河梯级电站与四川电网联网并对下一步工作提出了建议。
According to the current situation and development planning of Qamdo power grid in Tibet,the necessity and feasibility of Qamdo power grid connecting to other power grid at the end of the 12th Five-year Plan are discussed.Two schemes are compared,that is,its connection to Northwest power grid by Yushu power grid and another connection to Sichuan power grid by cascade hydropower stations on YuQu River.Finally,it is recommended that the connection to Sichuan power grid by cascade hydropower stations on YuQu River is more reasonable for Qamdo power grid,and the suggestions are given for further work.
出处
《四川电力技术》
2011年第4期48-51,共4页
Sichuan Electric Power Technology
关键词
昌都电网
联网
方案
Qamdo power grid in Tibet
interconnection
scheme