摘要
地下水严重的影响着地下工程开控过程中围岩的稳定和混凝土衬砌的质量。本文介绍了黑河金盆水利枢纽导流洞开挖及混凝土衬砌过程中排水措施。
The groundwater affects the stability of surrounding rock and the quality of concretelining during the diversion tunnel excavation- The drainage neasures for the construction of di-version tunnel excavation and concrete lining are introduced in this paper.
出处
《陕西水力发电》
1999年第4期13-16,共4页
Journal of Shaanxi Water Power
关键词
地下水
排水措施
导流洞
水利枢纽
groundwater
drainage measures
diversion tunnel of the Heihe Project