摘要
混凝土面板堆石坝中过渡料、垫层料和面板的几何尺寸及施工质量直接影响着坝体的防渗效果和坝体的安全运行。在乌鲁瓦提面板堆石坝的施工中,对各料区、边坡及面板的施工进行了严格的测量监控,取得了一定的成效。
The quality of construction, materials of transition and cushion layers, the size of faceslab are directly affecting the result of seepage prevention and the sacty operation of the face slabrockfill dam. In construction of Wuluwati face slab rockfill dam, the stocking yards, the slope,and the slabs are controlled str1ctly by surveying, which achieve some effects.
出处
《陕西水力发电》
1999年第4期36-40,共5页
Journal of Shaanxi Water Power
关键词
面板堆石坝
施工测量
控制
concrete face rockfill dam
construction
survey