3Structure requirements for railway vehicles[S]. Railway Group Standard GM/RT2100,Issue 1, July 1994.
4Scholes,A. and Lewis,J. H. Development of crashworthiness forrailway vehicle structures[J]. Proc. Instn Mech. Engrs, Part F,Journal of Rail and Rapid Transit, 1993,207(F1 ), 1 16.
5Lewis,J. H. Review of crashworthiness work undertaken by BR Research 1984-1996[R]. British Rail Research Report RR-STR-96-039,1996.
6Lewis,J. H. ,Rasaiah,W. G. and Scholes, A. Validation of measures to improve rail vehicle crashworthiness [J]. Proc. Instn Mech. Engrs, Part F, Journal of Rail and Rapid Transit,1996,210(F2) ,73-85.
7Lu, G. Collision behaviour of crashworthy vehicles in rakes[J].Proc. Instn Mech. Engrs, Part F, Journal of Rail and Rapid Transit, 1999,213 (F3), 143-160.
8Structure requirements for railway vehicles[S]. Railway Group Standard GM/RT2100,Issue 3, October 2000.
9Scholes, A. Structural design loading of railway vehicle bodies[C]. In Proceedings of Railtech Seminar,Birmingham,24-26 May1994, paper C478/1/091.