摘要 通过建立竖向振动舒适度长期监测系统,测试了青岛体育中心综合训练馆大跨度混凝土楼盖在主体结构完成、木地板铺设完成、整体结构完成等4个典型阶段的动力特性;实测了在单人行走、多人齐步行走、多人跳跃、多人随机及正常比赛训练等多种激励情况下结构楼面的加速度反应,并与有限元分析及英国混凝土协会建议的计算方法(CCIP-016)进行了比较。结果表明,大跨度楼盖具有典型的模态密集特性,本例中木地板的刚度贡献可以忽略。人致激励的类型和行走路线对楼盖动力响应影响显著。CCIP-016的动力响应计算结果比实测值小。上述结果可为全面了解大跨度预应力楼盖的实际动力性态、验证现有计算方法的合理性及类似建筑的舒适度评估提供依据。 A permanent vibration serviceability monitoring system was installed on the post-tensioned concrete floor of Training Hall in Qingdao Sport Center.The measurement results for three distinct construction phases,from completion of main floor structure to fully open to the public,were summarized in terms of variation of dynamic properties and dynamic response due to different human-induced excitation like single person walking,multi-people marching and multi-people jumping.Furthermore,the dynamic properties of the floor were also computed through finite element analysis and simplified hand-calculation approaches suggested by CCIP-016.It is found that the large-span floor has very closely-spaced modes of vibration,and the contribution of wooden floor to the total floor stiffness is neglectable in this case.Type of human-induced excitation and the walking route has a significant effect on the floor responses.The dynamic responses calculated by CCIP-016 are smaller than that of the field measurements.Observations in this study are of significance for understanding the real dynamic properties of large-span post-tensioned floor,for verifying the applicability of current design method,and for being a reference for vibration serviceability assessment of similar structures.
出处 《建筑结构》 CSCD 北大核心 2011年第8期115-119,共5页 Building Structure
关键词 大跨度楼盖 竖向振动 舒适度 动力测试 有限元分析 large-span floor vertical vibration serviceability dynamic tests finite element analysis
  • 相关文献

参考文献8

  • 1PAVIC A, REYNOLDS P, WALDRON P, et al. Critical review of guidelines for checking vibration serviceability of post-tensioned concrete floors [ Jl. Cement & Concrete Composites,2001, 23(1) : 21-31.
  • 2The UK Concrete Society. The Concrete Society Technical report No. 43: Post tensioned-concrete floors design handbook[ M ]. Camberley : the Concrete Society, 2007.
  • 3WILLFORD M, YOUNG P. A design guide for footfall induced vibration of structures: CCIP-016 [ M ]. The Concrete Center, 2006.
  • 4李东,法永生,孙翠华,鲍亮5.某人行桥人致振动分析及其舒适度评价[J].建筑结构,2008,38(6):50-53. 被引量:10
  • 5黄健,娄宇,王庆扬.多层体育健身场馆楼盖系统的舒适度设计[J].建筑结构,2008,38(8):102-105. 被引量:15
  • 6朱鸣,张志强,柯长华,张徐,李爱群.大跨度钢结构楼盖竖向振动舒适度的研究[J].建筑结构,2008,38(1):72-76. 被引量:82
  • 7REYNOLDS P, PAVIC A. Effects of false floors on vibration serviceability of building floors. II: Response to pedestrian excitation [ J ]. J. of Performance of Constructed Facilities ,2003, 17 (2) : 87-96.
  • 8America Institute of Steel guide 11 : Floor vibration AISC, 1997. Construction. AISC due to human activity Design EMI.

二级参考文献17

  • 1方重,吕西林.电液伺服式TMD结构控制系统分析[J].世界地震工程,1994,10(4):18-23. 被引量:6
  • 2法永生,李东.某钢结构人行天桥动力特性测试与有限元分析[J].建筑结构,2007,37(3):63-65. 被引量:15
  • 3National Building Code of Canada 1995[S].
  • 4Floor Vibrations Due to Human Activity[S]. AISC. Steel Design Guide Series No.11, 1997.
  • 5Evaluation of Huma 4 - 9n Exposure to Whole-Body Vibration[ R]. ISO 2631-1,2.
  • 6Human response to vibration-measuring instrumentation [ R]. ISO 8041:2005.
  • 7Guide to the Evaluation of Human Exposure to Vibration in Buildings [S]. 1983, American National Institute Standard, ANSI 53.29-1983.
  • 8Guide to the Evaluation of Human Exposure to Whole-Body Vibration [S]. 1983, American National Institute Standard, ANSI 53.18-1983.
  • 9人体全身振动环境的测量规范(GB/T13441-92)[S].国家技术监督局,1992.
  • 10人体全身振动暴露的舒适性降低界限和评价准则(GB/T13442-92)[S].国家技术监督局,1992.