摘要
鄱阳湖大桥东塔基采用冷冻法施工在我国桥梁界尚属首例,桥址处的地质水文条件十分恶劣,施工难度较大。通过对鄱阳湖大桥东塔基冻结法施工监理进行研究,可为相关工程实践提供借鉴。
It is the first case in China bridge sector to use the freezing method in construction of Poyang Lake Bridge east tower foundation,and the geological and hydrological conditions of bridge site are very adverse.It can provide reference for relational engineering practices through the research of supervision of freezing method construction in Poyang Lake Bridge east tower foundation.
出处
《交通标准化》
2011年第9期126-130,共5页
Communications Standardization
关键词
鄱阳湖大桥
冻结法
监理
Poyang Lake Bridge
freezing method
supervision