摘要
通过对华山医院模板及承重架搭设设计与施工的介绍,探求设计方法与施工途径的完美结合,克服由于设计与施工的分离致使费用增加等弊病。
The design and construction of Huashan hospital template and load-bearing frameer erection was presented to explore perfect combination of design method and construction approaches,and ills like cost increased by the separation of design and construction were overcome.
出处
《价值工程》
2011年第24期79-81,共3页
Value Engineering
关键词
梁
柱模板设计
施工要求
beam
column template design
construction requirements