摘要
以某医院综合楼现浇DL内模空心板为例,介绍了现浇DL内模空心板的施工工艺,解决了在施工中DL内模上浮及定位的问题,保证了施工质量及进度,为以后类似现浇空心板的施工提供了经验。
Taking a hospital complex building east-in-situ DL internal model hollow slab as an example, this paper introduces east-in-situ DL internal model hollow slab construction craft, solved in the construction of DL internal model floatation and positioning of the problem, and to ensure the construction quality and schedule for the future similar east-in-situ hollow slab construction provides experience.
出处
《山西建筑》
2011年第18期81-82,共2页
Shanxi Architecture
关键词
现浇DL内模空心板
抗漂浮
定位
施工技术
cast-in-situ DL internal model hollow slab, anti-floating, t'Lxed position, construction technology