期刊文献+

静力水准自动化监测系统在变形观测中的应用 被引量:7

Application of static level automatic monitoring system in thedeformation observation
下载PDF
导出
摘要 介绍了静力水准系统工作原理,结合工程变形观测,阐述了静力水准自动化监测系统的优越性,以及静力水准在工程中运用的经验,并分析了温度等因素对监测结果的影响,从而得出了一些有益的结论。 The paper introduced the working principle of static level system, combining with engineering deformation observation, elaborated the superiority of static level automatic monitoring system, with the use of static level engineering experience, analyzed the factors such as temperature of the influence of the monitoring results, to draw some useful conclusions.
作者 戴加东 王勇
出处 《山西建筑》 2011年第18期198-199,共2页 Shanxi Architecture
关键词 静力水准 自动化 温度 传压液体 static level, automation, temperature, transmitting pressure liquid
  • 相关文献

参考文献3

二级参考文献10

  • 1何晓业.静力水准系统在大科学工程中的应用及发展趋势[J].核科学与工程,2006,26(4):332-336. 被引量:25
  • 2Wolfgang Schauerte.Surveying and Alignment Concept for the Bonn Electron Stretcher Accelerator (ELSA)[C],Proceedings of the Second International Workshop On Accelerator Alignment,Sept 10-12,1990:3-9.
  • 3lngobert Schmadel,Geodetic Survey and Component Alignment of the Combined Heavy Ion Synchrotron SIS and the Experimental Storage Cooler Ring ESR[C],Proceedings of the Second International Workshop On Accelerator Alignment,Sept 10-12,1990:11-25.
  • 4Endo K.Precise alignment method for tristan accelerator[C],Proceedings of the Second International Workshop On Accelerator Alignment,Sept 10-12,1990:27-43.
  • 5Korittke N.Influence of horizontal Refraction on the traverse Measurements in Tunnels with Small Diameters[C].the Second International Workshop On Accelerator Alignment,Sept 10-12,1990:315-330.
  • 6Christian lasseur.Geodetic metrology for large experiments[C],the Second International Workshop On Accelerator Alignment,Sept 10-12,1990:345-357.
  • 7Martin D.Appliction of hydrostatic levelling in civil engineering[C],Proceedings of the Third International Workshop on Accelerator Alignment,Sept.28-Oct.1,1993:93-100.
  • 8Daniel Roux.A historical first on accelerator alignment[C].Proceedings of the Third International Workshop on Accelerator Alignment,CERN,Sep.28-Oct.1,1993:83-92.
  • 9Martin D,Roux D.Real time altimeter control by a hydrostatic levelling sysytem[C].Proceedings of the Second International Workshop On Accelerator Alignment,Sept 10-12,1990:171-182.
  • 10吕刚,刘广林,刘果.新型大坝变形、渗漏自动监测仪器及监测系统的研制[J].大坝观测与土工测试,2000,24(5):1-3. 被引量:6

共引文献51

同被引文献25

引证文献7

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部