摘要 玛纳斯河流域属水资源紧缺区域,兴建玛纳斯河河谷水源地工程,可提高石河子市和玛纳斯县玛纳斯河灌区工业及生活供水保证率,在特枯干旱年份水源地机井开采方式可与供水范围内备用供水设施结合,为玛纳斯河流域灌区抗旱应急供水,可最大限度地减少因干旱造成的经济损失。 Based on the overall-process simulation of Roller Compacted Concrete(RCC) dam construction,a real-time dynamic model is set up.According to the simulation results on resources,mechanical configuration route are reached.Comparing the route with the previous mechanical configuration data,it is concluded that mechanical scheduling data.With the modular design,the system achieved the real-time simulation under different working conditions.Meantime,it can actually reflect the uncertainties of the RCC dam construction,promptly and precisely.The system gives important guidance to making the decisions of construction scheduling management.At last,a case illustrates that the system is effective and reliable.
作者 郭贺洁 王俊
出处 《中国农村水利水电》 北大核心 2011年第8期104-106,113,共3页 China Rural Water and Hydropower
关键词 水源地 机井 开采方式 RCC dam construction real-time dynamic scheduling management
  • 相关文献

参考文献8

二级参考文献16

  • 1邓铭江,裴建生,王智.干旱区内陆河流域地貌单元特征及地下水储水构造[J].水利学报,2006,37(11):1360-1366. 被引量:20
  • 2李旺林,束龙仓,李砚阁,李桂国.承压含水层非完整反滤回灌井的稳定流计算[J].水文地质工程地质,2007,34(2):67-70. 被引量:11
  • 3吴标云.镇江市水文地质工程地质环境地质综合勘察报告[R].镇江:镇江市勘察测绘研究院,1992.
  • 4江苏省地质工程勘察院.江苏省镇江市规划区地下水资源评价报告[R].南京:江苏省地质工程勘察院,1995.
  • 5刘仲华,章念生.综述:21世纪的水安全[N].人民日报,2000-08-25(7).
  • 6镇江水文水资源勘测局.江苏省镇江市水资源开发利用现状调查分析报告[R].镇江:镇江水文水资源勘测局,1998.
  • 7昌吉州水利科学技术研究所,新疆昌吉水文水资源勘测局.新疆玛纳斯县平原区地下水超采区划定报告[R].昌吉:昌吉州水利科学技术研究所,新疆昌吉水文水资源勘测局,2006.
  • 8新疆地下水资源开发利用规划工作技术细则[z].乌鲁木齐:新疆维吾尔自治区水利厅,2001.
  • 9新疆阿克苏水文水资源局.台兰河地表水资源研究[R].2008.
  • 10中国科学院地球物理研究所.天山山前典型流域水循环研究[R].2009.

共引文献23

同被引文献16

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部