摘要
结合西安曲江新区工程实例,根据场地岩土工程勘察成果,重点分析评价了地下水位变幅原因及其对湿陷性黄土地基处理深度和处理方法的特殊要求,对同类工程具有指导作用。
Combining with engineering example of Xi'an Qujiang newly developed area,according to the investigation results of site geotechnical engineering,this paper emphatically analysed and evaluated the underground water level luffing reasons and its special requirements to collapsibility of loess foundation treatment depth and processing method,had a guiding role for similar projects.
出处
《山西建筑》
2011年第25期66-67,共2页
Shanxi Architecture
关键词
黄土湿陷性
湿陷等级
地下水位变幅
地基处理
collapsibility of loess
collapsible level
underground water level luffing
foundation treatment