摘要
根据首钢京唐钢铁厂建设地点的特殊性,详细介绍沙土地供暖热水管网有补偿直埋敷设设计的方法和技术要点,尤其是对供暖热水管网中的管道布置和有关补偿器、检查井、固定支架、导向支架的设计要点和设计步骤作了较全面的归纳总结,对同类工程有一定借鉴作用。
According to the particularity of Shougang Jingtang Iron & Steel Complex' Location, This paper introduces the methods and techniques of the design of the hot water heating network built- in with Compensators in sand. Also made a more comprehensive summarized, especially for the hot water heating network layout and the design important point and step of the compensator settings, the inspection chamber, the oriented bracket and the fixed bracket. It can be used for reference for the similar projects.
关键词
供热
直埋敷设
检查井
支架
补偿器
hot water heating
direct built - in
inspection chamber
bracket
compensator