摘要
阐述了320MW国产燃油机组甩负荷试验的高低旁路控制、电液调节控制和热工自动控制方案、控制过程,对甩负荷过程中的主汽压力、燃油压力、炉膛负压、汽机转速等过程参数的控制有较详细的描述,并针对试验中出现的问题的解决方法进行了描述。
The ways of the high and low Pressure bypass control,Electric Hydraulic control and thethermodynamic automatic control in the load rejection test of China made 320 MW oil fired turbo-generator units have been described. The detailed description about the control of the process parameterssuch as the main steam pressure,fuel oil pressure,furnace pressure and the turbine speed has been presented. Solutions to the problems in the test have also been described.
出处
《湖北电力》
1999年第4期30-33,共4页
Hubei Electric Power