摘要
通过制定合理的烘炉和开炉方案,确定适宜的开炉工作参数,加强高炉操作调剂等措施,邯钢3 200 m3高炉实现了开炉快速达产。
Through establishing reasonable dry-machine and blow-in program,and determining appropriate operating parameters for blow-in,strengthening the furnace blast furnace operation adjustment measures,Handan iron and steel company 3 200 m3 blast furnace to achieved a quick arrival at full capacity.
出处
《甘肃冶金》
2011年第4期11-14,共4页
Gansu Metallurgy
关键词
大型高炉
开炉方案
达产
large sized blast furnace
blow-in plan
arrival at full capacity