期刊文献+

从审计角度谈基建工程施工合同的拟订 被引量:2

Making Implementation Contract of Capital Construction from the View of Audit
下载PDF
导出
摘要 从施工合同审计工作中关注的重点及合同条款中容易出现的问题提出了拟订施工合同主要条款时应注意的事项,以确保合同条款完整、合理,并为合同的顺利执行打下坚实的基础。 Discussing the drafting of the basic construction turn-key contract in audit supervision view,pointed out the key audit point and the essential article in the drafts,and guaranteed that the contract terms were complete,are reasonable,and built the solid foundation for the contract smooth execution.
作者 陈秋云
出处 《热带农业工程》 2011年第2期39-42,共4页 Tropical Agricultural Engineering
基金 中央级公益性科研院所基本科研业务费专项(NO.2008-YBJ-09 2009-YBJ-09)
关键词 审计 基建工程 施工合同 audit capital construction project implementation contract
  • 相关文献

同被引文献17

  • 1白永红.建设项目审计中的三种审计.理财,2011,.
  • 2Sichombo, B., Muya, M., Shakantu, W., Kaliba, C. The need for technical auditing in the Zambian construction industry[J]. International Journal of Project Management, 2009, 27 (8): 821-832.
  • 3Sohail, M., and Cavill, S. Accountability to Prevent Corruption in Construction Projects[J]. Journal of Construction Engineering and Management, 2008, 134 (9): 729-738.
  • 4Karim, M. A., Smith, A. J. R., Halgamuge, S. Empirical relationships between some manufacturing practices and performance[J]. International Journal of Production Research, 2008, 46 (13): 3583-3613.
  • 5Zhang, Z. F., Chu, X. N. Risk prioritization in failure mode and effects analysis under uncertainty[J]. Expert Systems with Applications, 2011 ( 38 ): 206-214.
  • 6Puente, J., Pino, R., Priore, P., and Fuente, D. A decision support system fbr applying failure mode and effects analysis[J]. International Journal of Quality & Reliability Management, 2002, 19 (2): 137-150.
  • 7Anand Pillay, Jin Wang. Modified failure mode and effects analysis using approximate reasoning[J]. Reliability Engineering & System Safety, 2003, 79 ( 1 ): 69-85.
  • 8Ayyub, B. M. Risk analysis in engineering and economies[M]. Chapman & HaI1/CRC, New York, 2003.
  • 9Abdelgawad, M., Fayek, A. R. Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP[J]. Journal of Construction Engineering and Management, 2010, 136 (9): 1028-1026.
  • 10Antonio C. F. Guimar:es, Celso Mareelo Franklin Lapa. Effects analysis fuzzy inference system in nuclear problems using approximate reasoning[J]. Annals of Nuclear Energy, 2004, 31 (1): 107-115.

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部