武汉鹦鹉洲长江大桥南锚碇基础设计 被引量:7

Design of South Anchorage Foundation of Yingwuzhou Changjiang River Bridge in Wuhan
下载PDF
导出
摘要 武汉鹦鹉洲长江大桥主桥为三塔四跨结合梁悬索桥,加劲梁跨径布置为(200+2×850+200)m。该桥南锚碇基础经多方案比选采用圆形嵌岩地下连续墙基础。地下连续墙外径68m、壁厚1.5m,底板厚6m,顶板厚14.5m。导墙由2个L形钢筋混凝土墙组成,墙间距1.6m;帽梁总宽4.0m、高2.5m;内衬厚1.5~2.5m;在地下连续墙外围设置环形防渗帷幕。采用“理正深基坑软件”分析地下连续墙施工全过程的受力,进行结构配筋。采用软件FLAC3D建立基坑及周围土体三维模型,分析基坑开挖对长江大堤变形的影响,分析结果表明,正常施工时,周边建筑及长江大堤的安全可以得到保证。 The main bridge of Yingwuzhou Changjiang River Bridge in Wuhan is a three-tower and four-span composite girder suspension bridge with span arrangement for its stiffening girder being (200+2 × 850+200) m. After comparison of different design proposals, it was determined that the rock socketed circular diaphragm wall would be used for the south anchorage foundation of the bridge. The outer diameter of the diaphragm wall is 68 m, the thickness of the wall is 1.5 m, the base plate is 6 m and the top plate is 14.5 m. The part of the pilot wall is formed by two L-shape reinforce concrete walls having a spacing distance of 1.6 m. The total width of the capping beam is 4.0 m and the depth is 2.5 m and the thickness of the inner lagging is 1.5-2.5 m. At the outside of the diaphragm wall, the circular cut-off curtain was arranged. The Lizheng Software for Deep Foundation Pits was used to analyze the force conditions of the whole construction process of the diaphragm wall and to determine the reinforcement arrangement of the structure. The software FLAC3D was used to set up the three-dimensional models for both the foundation pit and the earth around the pit and to analyze the influence of excavation of the pit on the deformation of the river dyke. The results of the analysis indicate that in the case of normal construction, the safety of the ambient buildings and the river dyke can be guaranteed.
作者 罗昕
出处 《桥梁建设》 EI CSCD 北大核心 2011年第4期5-9,共5页 Bridge Construction
关键词 悬索桥 锚碇 地下连续墙 基坑 设计 施工 有限元法 suspension bridge anchorage diaphragm wall foundation pit design construction finite element method
  • 相关文献

参考文献10

二级参考文献16

  • 1胡永生,赵有明,杜洪池.珠江黄埔大桥锚碇基础地下连续墙施工技术[J].桥梁建设,2006,36(5):59-61. 被引量:16
  • 2杨进.泰州长江公路大桥主桥三塔悬索桥方案设计的技术理念[J].桥梁建设,2007,37(3):33-35. 被引量:51
  • 3[2]孙钊.大坝基础灌浆[M].北京:中国水利水电出版社,2004.
  • 4[3]堤防垂直防渗与地基加固技术[R].武汉:长江水利委员会,2006.
  • 5[4]水利电力部.土工试验规程[M].北京:水利出版社,1980.
  • 6Review of Design Methods for Eexcavation(GCO Publication NO.1/90). Geotechnical Engineering Office Civil Engineering Department. The Govern-ment of the Hong Kong special Administrative Region.
  • 7高玉璞.大坝基础防渗墙[M].北京:中国电力出版社,2000.
  • 8林鸣,吴浩,沈斌,等.润扬长江公路大桥北锚碇地连墙施工技术[C]//中国公路学会桥梁和结构工程学会2002年全国桥梁学术会议论文集.北京:人民交通出版社,2002.
  • 9何超然,刘军民,王磊,等.阳逻长江公路大桥超深、超厚圆形基坑地下连续墙施工技术[C]∥中国公路学会桥梁和结构工程学会2004年全国桥梁学术会议论文集.北京:人民交通出版社,2004.
  • 10杨进,徐恭义,韩大章,万田保,陆勤丰,罗喜恒.泰州长江公路大桥三塔两跨悬索桥总体设计与结构选型[J].桥梁建设,2008,38(1):37-40. 被引量:29

共引文献167

同被引文献53

引证文献7

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部