猴子岩水电站面板堆石坝面板垂直缝垫缝材料研究 被引量:1

Study on Vertical Joint Sealing Material for the Concrete Slab of Houziyan CFRD
下载PDF
导出
摘要 目前,高混凝土面板堆石坝中已开始出现面板接缝混凝土挤压破坏的现象。以猴子岩面板堆石坝已有垫层表面位移成果为依据,建立面板和垫层的子结构静动力有限元模型,采用数值分析方法分析不同垂直缝垫缝材料对面板应力的影响,进而提出垫缝材料的选取建议。结论为,所涉及的两种垂直缝垫缝材料均能有效降低面板的水平向最大压应力和水平向最大压应变,其中桦木方案由于可以有效降低面板坡向压应变,对于防止面板的水平向挤压破坏明显有利,故推荐为垂直缝的垫缝材料。 The concrete spalling failure of the slab joints in high CFRD has appeared in current engineering practices. Based on existing displacement data of cushion surface of Houziyan CFRD, the static and dynamic FEM-based sub-structure models including slab and cushion are set up. The effects of different vertical joint sealing materials on stresses of concrete slab are analyzed by numerical method, and the suitable joint sealing material is suggested. The studies show that both of the two studied joint sealing materials can effectively decrease the maximum compressive stress and strain in horizontal direction, and in which, the birch is more suitable as sealing material because it can effectively decrease the maximum compressive strain in slop direction and can prevent slab spalling failure in horizontal direction.
出处 《水力发电》 北大核心 2011年第8期24-27,共4页 Water Power
关键词 混凝土面板 垂直缝 垫缝材料 挤压破坏 猴子岩水电站 concrete slab vertical joint joint sealing material spalling failure Houziyan Hydropower Station
  • 相关文献

参考文献5

  • 1de S. Pinto N L. Very high CFRD dams-Behavior and design features[C]//3rd Symposium on CFRD Dams. Brazil: 2007.
  • 2郝巨涛.300m级高面板堆石坝接缝止水系统变形适应性研究.300m级高面板堆石坝防渗和止水系统适应性研究[R].北京:中国水利水电科学研究院.2009.
  • 3郝巨涛,杜振坤.高混凝土面板堆石坝面板接缝挤压破坏预防措施研究[J].水力发电,2008,34(6):41-44. 被引量:16
  • 4大连理工大学.中国水电顾问集团成都勘测设计研究院.四川省大渡河猴子岩水电站混凝土面板堆石坝三维有限元静动力有限元分析[R].大连:大连理工大学,2009.
  • 5贾金生,郝巨涛,吕小彬,等.适应大变形的接缝止水结构和材料研究[R].中国水利水电科学研究院,华东勘测设计研究院.2000.

二级参考文献7

  • 1张嘎,张建民.粗粒土与结构接触面的静动本构规律[J].岩土工程学报,2005,27(5):516-520. 被引量:15
  • 2杨泽艳,周建平.我国特高面板堆石坝的建设与技术展望[J].水力发电,2007,33(1):64-68. 被引量:32
  • 3Cao Keming, Zhong Ping, Cai Changguang, Design research for very high CFRD[A]. Proceedings Workshop on High Dam KnowHow[C]. Yichang, China, 2007.
  • 4Manoel S., Freitas Jr., Paulo T. Cruz. Unpredicted cracks and ruptures at face slab in CFRDs - Repairing works and treatment[A]. Proceedings Workshop on High Dam Know-How [C]. Yichang, China, 2007.
  • 5Updates on some major CFRD projects [J]. International Journal on Hydropower & Dams, 2004, 11(3): 109-113.
  • 6http://www.waterpowermagazine.com/story.asp?storyCode=2045919.(网页文章).
  • 7P, Marques Filho, N, L, de S. Pinto. CFRD dam characteristics learned from experience [J], International Journal on Hydropower & Dams, 2005, 12(1): 72-76.

共引文献15

同被引文献3

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部