地下矿生产计划三维编制技术及动态管理 被引量:6

Three-dimensional Production Planning Technique and Dynamic Management of Production Plan for Underground Mine
原文传递
导出
摘要 在对地下矿山生产的基本特征及矿山对生产计划编制需求分析研究的基础上,从地下矿山三维可视化生产计划编制的核心技术出发,全面阐述了地下矿生产计划三维可视化编制的基本原理、平台基础、优化技术及其实现方法。在此基础上,通过实际工程应用情况,系统的介绍了地下矿生产计划三维可视化编制技术及其动态管理的过程,进一步说明了该技术的可行性和科学性。 Based on the analysis of the basic characteristics of underground mining and the demand of ,nine on production planning,the paper makes a comprehensive exposition of the basic principles, platform foundation, optimization techniques and implementation method of three dimensional production planning for underground mine starting from the core technology of 3D production planning. On this basis, through an example of practical application,the process of 3D visualization production plan ning technology and dynamic management of production plan for underground mine are systematically introduced to further illustrate the feasibility and rationality of this technology.
出处 《矿业研究与开发》 CAS 北大核心 2011年第4期62-65,共4页 Mining Research and Development
基金 云南省省院省校科技合作计划项目(2006YX26) 云南省技术创新暨产业发展专项项目(2007GA007)
关键词 地下矿 三维可视化 生产计划 优化技术 实现方簋口 动态管理 Underground mine 3D visualization, Productionplan, Optimization technique, Implementation method, Dynamicmanagement
  • 相关文献

参考文献10

二级参考文献41

共引文献84

同被引文献106

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部