摘要
提出了地县一体调度自动化系统建设的思路,介绍了远程工作站模式、分布采集模式、容灾备用模式等建设模式,对比分析了各种模式的优缺点以及一体化系统的技术优势,给出了建设模式选择的重要判定因素。
Some modes are introduced including remote workstations,distributed acquisition and disaster recovery and backup;their advantages and disadvantages are contrasted and the technical dominance of incorporated system is presented.In addition,significant factors in the selection of construction mode are given.
出处
《湖北电力》
2011年第4期21-22,26,共3页
Hubei Electric Power
关键词
县级调度
调度自动化系统
远程工作站
county-level dispatching
dispatching automation systems
remote workstations