桂花水电站掺气分流墩与消力池联合应用消能效果的研究 被引量:3

Research on Energy Dissipation Effects of Combined Application of Guihua Hydropower Station Aerated Baffle and Absorption Basin
下载PDF
导出
摘要 通过试验研究了桂花水电站拱坝掺气分流墩的体型、布置和水流流态,消力池和消力池中T型墩的体型和布置,掺气分流墩和消力池联合应用的水流流态和消能效果。试验表明,掺气分流墩与消力池联合应用明显改变了水流流态,具有显著的消能效果。 The shape distribution and water current flow pattern of Guihua Hydropower Station Aerated Baffle,the shape and distribution of the absorption basin and T-shaped piles in the absorption basin,and the water current flow pattern and energy dissipation effect of combined application of aerated baffle and absorption basin are studied through test.The test shows that the combined application of aerated baffle and absorption basin can greatly change the water current flow pattern and has prominent energy dissipation effect.
作者 张应亮
出处 《中国水能及电气化》 2011年第8期39-44,58,共7页 China Water Power & Electrification
关键词 水电站 掺气分流墩 消力池 水流流态 消能 hydropower station aerated baffle absorption basin water current flow pattern energy dissipation.
  • 相关文献

参考文献3

  • 1张志昌.桂花水电站水工模型试验[R].西安:西安理工大学水利水电学院,2005.35-61.
  • 2阎晋垣 唐允吉 郭天德.柘林掺气分流墩设施的研究.水利学报,1988,.
  • 3吴持恭.水力学下册[M].第2版.北京:高等教育出版社.1982.28-36.