基于遗传算法的作业车间提前/拖期调度问题 被引量:8

Job Shop earliness/tardiness scheduling problem based on genetic algorithm
下载PDF
导出
摘要 针对带有交货期窗口硬约束并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法,该算法采用"逆向后推"和"顺向前拉"相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以降低在制品流动成本和成品提前库存成本。通过80组调度测试用例的仿真结果表明,该算法在降低调度总成本和拖期成本方面具有一定的优势。 To deal with the Job Shop scheduling problem with due window hard rationing and earliness/tardiness parts punishment of jobs, a new Enhanced Genetic Algorithm (EGA) based on a two phase solution strategy was designed, which included converse push back and consequent pull over. Because some chromosomes disobeyed due window hard rationing in decoding process, illegal solutions were generated. Aiming at this problem, chromosome repair method based on critical path was used to adjust gene sequence of chromosome. Thereby, satisfaction of due window hard rationing as well as reduction of parts delay cost could be realized. Based on keeping tardiness costs unchanged, a target value revision method based on reverse rescheduling was put forward to postpone job release date to reduce flowtime costs and earliness costs introduced by each job. The proposed method was tested on a wide range of 80 scheduling problems. Results demonstrated its advantages in reducing total cost and tardiness cost.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2011年第8期1798-1805,共8页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(50705076) 国家863计划资助项目(2007AA04Z187 2007AA040701)~~
关键词 作业车间调度 交货期窗口硬约束 提前/拖期 染色体修复 目标值修订 遗传算法 Job Shop scheduling due window hard rationing earliness/tardiness chromosome repair objective value revision genetic algorithms
  • 相关文献

参考文献12

  • 1LAUFF V, WERNER F. Scheduling with common due date, earliness and tardiness penalties for multimachine problems: a survey[J]. Mathematical and Computer Modelling, 2004,40 (5/6) :637-655.
  • 2SEN T, SULEK J M, DILEEPAN P. Static scheduling rese- arch to minimize weighted and u nweighted tardiness:a state-of-the-art survey [J], International Journal of Production Eeo nomics, 2003,83 ( 1 ): 1-12.
  • 3ESSAFI I, MATI Y, DAUZERE-PERES S. A genetic local search algorithm for minimizing total weighted tardiness in the Job-Shop scheduling problem [J]. Computers & Operations Research,2008,35(8) :2599-2616.
  • 4THIAG-ARAJAN S, RAJENDRAN C. Scheduling in dynamic assembly Job Shops to minimize the sum of weighted earliness, weighted lardiness and weighted flowtime of jobs[J]. Comput- ers& Industrial Engineering,2005,49(4):463-503.
  • 5姚伟力,杨德礼,胡祥培.Job-shop提前/拖期调度问题的研究[J].控制与决策,2000,15(3):322-324. 被引量:11
  • 6SADEH N. Look ahead techniques for micro opportunistic Job Shop scheduling[D]. Pittsburgh, Pa. , USA:Carnegie Mellon University, 1991.
  • 7SADEH N. MICRO-BOSS:a micro-opporlunistic factory sch eduler[J]. Expert Systems with Applications, 1993,6(3) : 377- 392.
  • 8刘兴初,赵千川,郑大钟.用GA算法解不同交货期窗口下的E/T调度问题[J].清华大学学报(自然科学版),2000,40(7):59-62. 被引量:11
  • 9黄德才,朱艺华,王万良.带公共交货期窗口的提前/拖期非等同多机调度问题[J].系统工程理论与实践,2001,21(4):64-69. 被引量:3
  • 10BAKER K R. Introduction to sequencing and scheduling[M]. New York, N. Y. , USA:Wisely, 1974.

二级参考文献30

  • 1金希东,李治.进化算法及其改进[J].西南交通大学学报,1996,31(2):138-144. 被引量:2
  • 2Yao Weili,Proc of Int Conf on Managem ent Science & Engi-neering,1998年,303页
  • 3姚伟力,中国系统工程与管理科学年会论文集,1998年,55页
  • 4于海斌,学位论文,1997年
  • 5Lee C Y,Comp Ops Res,1995年,22卷,857页
  • 6Cheng T C E,Comp Ops Res,1988年,15卷,91页
  • 7刘飞,CIMS制造自动化,1997年
  • 8Liao C J,J Opera Res Soc,1991年,42卷,3期,302页
  • 9Van D E V E L H,J Opera Res Soc,1991年,42卷,2期,169页
  • 10Cheng T C E,Computer and Operation Research,1988年,15卷,91页

共引文献125

同被引文献66

引证文献8

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部