期刊文献+

一种基于仿真的流程工业生产调度闭环优化方法 被引量:3

Simulation-based Closed-loop Optimization Method for Production Scheduling
下载PDF
导出
摘要 针对流程工业实际调度过程中存在的调度执行滞后、装置不完全利用以及生产资源浪费等问题,提出一种基于仿真的闭环调度优化方法,该方法具有多层次建模、分层调度优化及闭环校正等特点。 A new stratified scheduling optimization method based on process simulation was proposed to deal with execution lags,device incomplete utilization and resources waste in process industry.This method has multi-level modeling,layered scheduling optimization and closed-loop correction.The operation result proves the effectiveness and scheduling robustness under various production uncertainties.
出处 《化工自动化及仪表》 CAS 北大核心 2011年第4期369-374,共6页 Control and Instruments in Chemical Industry
关键词 生产调度 多层次仿真 闭环优化 流程模拟 production scheduling multi-level simulation closed-loop optimization process simulation
  • 相关文献

参考文献10

  • 1Maravelias C T,Sung C.Integration of Production Planning and Scheduling Overview Challenges and Opportunities[J].Computers and Chemical Engineering,2009,33 (12):1919 ~ 1930.
  • 2Pelham R,Pharris C.Refinery Operation and Control:a Future Vision,Hydrocarbon Processing[J].1996,75(7):89 ~94.
  • 3Reklaitis G V.Scheduling Approaches for the Batch Process Industries[J].ISA Transactions,1995,34(4):349 ~358.
  • 4Lundgren M G,Lundgren J T.An Optimization Model for Refinery Production Scheduling[J].Int J Production Economics,2002,78 (3):255 ~ 270.
  • 5Artiba A,Riane F.An Application of a Planning and Scheduling Multi-model Approach in the Chemical Industry[J].Computer in Industry,1998,36 (3):209 ~ 229.
  • 6Abraham J N.Integration of Generative and Evaluative Models for Production Scheduling of Lube Oil Plants in a Petroleum Refinery[J].Applied Mathematical Modeling,2009,33(3):1213 ~ 1227.
  • 7冯毅萍,荣冈.流程工业智能工厂实验系统[J].信息与控制,2005,34(1):35-39. 被引量:14
  • 8罗春鹏,荣冈.A Strategy for the Integration of Production Planning and Scheduling in Refineries under Uncertainty[J].Chinese Journal of Chemical Engineering,2009,17(1):113-127. 被引量:10
  • 9楚纪正.常减压及催化裂化装置仿真系统[R].北京:北京化工大学,2010.
  • 10赵小强,荣冈.流程工业生产调度问题综述[J].化工自动化及仪表,2004,31(6):8-13. 被引量:29

二级参考文献42

  • 1ZHAO,Xiaoqiang(赵小强),RONG,Gang(荣冈).Blending Scheduling under Uncertainty Based on Particle Swarm Optimization Algorithm[J].Chinese Journal of Chemical Engineering,2005,13(4):535-541. 被引量:16
  • 2Almeida M R,Hamacher S,Pacheco M A C,Vellasco M B R.The Energy Minimization Method:a Multiobjective Fitne Evalution Technique and Its Application to the Production Scheduling in a Petroleum Refinery[A].Proceedings of the Evolutionary Computation[C].2001.5
  • 3Artiba A,Riane F.An Application of a Planning and Scheduling Multi-model Approach in the Chemical Indury[J].Computer in Indury,1998,36:209-229.
  • 4Oldenburg N,Gruhu G,oldt J.Capacity Analysis of Multi product Plants Integrating Energy Consumption[J].Applied Thermal Engineering,2001,21(13 14):1283-1298.
  • 5Pinto J M,Joly M,Moro L F L.Planning and Scheduling Models for Refinery Operations[J].Comp Chem Eng,2000,24:2259-2276.
  • 6Wu D,Ierapetritou M G.Decomposition Approaches for the Efficient Solution of Short term Scheduling Problems[J].Comp Chem Eng,2003,27:1261-1276.
  • 7Khayyal F,Griffin P K,Smith N R.Solution of a Large-scale Two age Decision and Scheduling Problem Using Decomposition[J].European Journal of Operational Research,2001,132:453-465.
  • 8Harjunkoski I,Gromann I E.A Decomposition Approach for the Scheduling of a eel Plant Production[J].Comp Chem Eng,2001,25:1647-1660.
  • 9Liao C J,Chen W J.Scheduling under Machine Breakdown in a Continuous Proce Indury[J].Computers & Operation Research,2004,31:415-428.
  • 10Liao C J,Yu W C.Sequencing Heuriics for Dependent Setups in a Continuous Proce Indury[J].Omega,1996,24(6):649-659.

共引文献50

同被引文献22

引证文献3

二级引证文献72

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部