摘要
研究在采用满堂支架施工的情况下,斜拉索及主梁的受力状态随施工阶段不同的变化情况,可以保障工程顺利实施。
It can ensure the smooth implementation of construction to research changing circumstances of stay cable and main girder in the construction stage with full framing construction.
出处
《交通标准化》
2011年第15期144-147,共4页
Communications Standardization
关键词
矮塔斜拉桥
满堂支架法
斜拉索
low-pylon cable-stayed bridge
full framing method