摘要
基于多年对盾构施工技术的研究,同时结合沈阳地铁二号线松陵区间盾构施工工程实例,阐述土压平衡盾构机施工对周围土体扰动的影响程度,可为类似工程参考和借鉴。
Based on the study of shield construction technology,and combined with the shield construction project of Songling Interval in Shenyang Metro Line 2,it describes the influence degree of earth pressure balance shield construction on the disturbance of surrounding soil,which can provide reference for similar projects.
出处
《交通标准化》
2011年第16期86-88,共3页
Communications Standardization
关键词
初始应力
围岩
稳定性
initial stress
surrounding rock
stability