介绍某高速铁路车站总体施工流程,对基坑开挖施工中的围护与抗拔桩基施工、土体加固、降水施工、土方开挖施工及围护支撑体系施工的技术方案进行探讨,分析基坑开挖及围护支撑施工安全技术措施。
The general construction procedure of one high-speed railway station is introduced.The technical scheme for excavation construction is explored,which includes the construction of enclosure protection and pullout pile,soil reinforcement,dewatering,earth excavation,and construction of enclosure protection support system.Finally,the safety measures for excavation and enclosure protection construction are analyzed.