摘要
结合工程实例,针对现场高大模板不能按常规搭设的实际情况制定、调整实施方案,落实施工技术措施。
Establishing and adjusting working plan,implementing construction measures by combining with exsiting engineering example.In the case of that the high-supported formwork can not be routinely built up.
出处
《江苏建筑》
2011年第4期41-42,共2页
Jiangsu Construction
关键词
高大
模板支撑
施工技术
施工管理
high
formwork-supportng
construction technology
implementing arrangement