摘要
长期以来,大型土方工程的工程量计算和工程进度控制主要通过现场布方格网法进行,这种方法不仅速度慢,而且精度太低,如设计地面为不规则,将更加难以处理,文章以工程实例说明通过拓普康全站仪GTS-102N结合南方cass8.0软件的应用,可以极大的提高土方工程量的计算精度和速度。
For a long time,quantities calculation and schedule control of large-scale earthwork project is basically based on arranging check net.There are disadvantages about this method such as slow speed and low accuracy.If the ground is irregular,it will be harder to handle.With a project example,the passage shows that quantities calculation and schedule control of large-scale earthwork project can be highly improved by using Topcon Electronic Total Station-102N which is combined with the South cass8.0 software.
出处
《江苏建筑》
2011年第4期59-62,共4页
Jiangsu Construction
关键词
全站仪
CASS
大型土方
electronic total station
cass
large-scale earthwork